Still a lot of work ahead, but lots of progress made these past two days.
Category: Uncategorized
Beginning New Work
Solanus
Dry Fit
Creating the Vault
Currently working on the vault of the structure of the current painting. Very challenging, but after much experimentation I’ve settled on using 1/8″ thick MDF material over 1/2 a cardboard roll to recreate the tiled roof. The tiles in this case are cut to 3/8 inches square with a 12 degree bevel to ensure a somewhat tight fit. Once fitted, I’ll sand the tiles smooth and paint them to match the plaster sides. 
Working on the Structure
For the current painting, I’m recreating a portion of the Globe Elevator in Superior, Wisconsin. More as this develops. 
Current Project
Virtual Exhibit Coming May 8 – Sept 12 at The Pablo Center at the Confluence, Eau Claire, WI
Check back here: https://www.pablocenter.org/visual-arts/season3/
Writeup for Verehrung
Here’s a great writeup on my painting Verehrung, which is currently on display in the Profiles showroom in NYC:
https://bicyclefineart.com/2017/09/25/visualizing-the-passage-of-time-in-eric-lees-verehrung/















You must be logged in to post a comment.