Beginning New Work

I continue my interest in specific structures set against the painted surface. Here we have the pilings of what will eventually be a bridge.

Creating the Vault

Currently working on the vault of the structure of the current painting. Very challenging, but after much experimentation I’ve settled on using 1/8″ thick MDF material over 1/2 a cardboard roll to recreate the tiled roof. The tiles in this case are cut to 3/8 inches square with a 12 degree bevel to ensure a somewhat tight fit. Once fitted, I’ll sand the tiles smooth and paint them to match the plaster sides.

Current Project

Writeup for Verehrung

Here’s a great writeup on my painting Verehrung, which is currently on display in the Profiles showroom in NYC:

https://bicyclefineart.com/2017/09/25/visualizing-the-passage-of-time-in-eric-lees-verehrung/

2

1

1 3.35.30 PM

2 3.35.30 PM