I continue my interest in specific structures set against the painted surface. Here we have the pilings of what will eventually be a bridge.
Category: Uncategorized
Solanus
Dry Fit
Creating the Vault
Currently working on the vault of the structure of the current painting. Very challenging, but after much experimentation I’ve settled on using 1/8″ thick MDF material over 1/2 a cardboard roll to recreate the tiled roof. The tiles in this case are cut to 3/8 inches square with a 12 degree bevel to ensure a somewhat tight fit. Once fitted, I’ll sand the tiles smooth and paint them to match the plaster sides.
Working on the Structure
For the current painting, I’m recreating a portion of the Globe Elevator in Superior, Wisconsin. More as this develops.
Current Project
Virtual Exhibit Coming May 8 – Sept 12 at The Pablo Center at the Confluence, Eau Claire, WI
Check back here: https://www.pablocenter.org/visual-arts/season3/
Writeup for Verehrung
Here’s a great writeup on my painting Verehrung, which is currently on display in the Profiles showroom in NYC:
Visualizing the Passage of Time in Eric Lee’s ‘Verehrung’
You must be logged in to post a comment.